Roadmap / 0.1.3.9.2
Potash sites: positions and imagery
v0.1.3.9.2, commit d3260ad. File docs/RESULTS_v0.1.3.9.2_potash_positions_imagery.md.
Written at this version and not revised since. Later versions may change these numbers; see the roadmap.
Switch: none. The model is unchanged from v0.1.3.8; results are identical and the golden check passes.
Runs: none new. This version fills in the potash site list.
Scope: unchanged. A site record says what a place is, who holds it, where (to about a kilometre), how much, its status and its source. Still out: the inside of any site, how a site could be damaged, rankings by harm, routes, methods and tactics.
Headline
- Every potash site that is a place now has a location. 33 of the 44 entries, up from 11. The other 11 are blocks of mineral rights, which are areas and have no single point.
- 32 site pages now carry satellite imagery. Public 10-metre Sentinel-2, one clean pass per site between 13 July and 6 November 2026, shown plain: a frame 5 km across and, for 28 of them, a frame 15 km across.
- Each position says how it was established. 13 come from a filed document or a government survey point, 17 were found and identified on satellite imagery, and 3 are a published locus for a project that has not been built.
- No result changes. Positions and pictures do not enter the simulation. They are what districts will be drawn from.
Where it came from
Roger Wilco Imagery's Canada potash baseline, built on 19 November 2026 from Kevin's potash inventory and published at
https://github.com/Prime-Rogue-Inc-Corporate/Canada-Potash-Sites. It covers 34 places: every inventory entry with a physical footprint.
tools/import_rwi_potash.py reads the delivery and writes the registry and the page images, so the step can be repeated when a new pass arrives.
The 11 locations the registry already held all agree with the baseline to the two decimals the registry keeps.
What was taken, and what was left
Taken - Each site's position, rounded to two decimals of a degree, and its confidence grade. - Both frames for each site, re-saved at web size (500 and 1,000 pixels across). The full-size originals are in the baseline's own repository. - Each frame's scene and date, and the credit and licence lines.
Left out, under the registry's rules
- The separate entry for a shaft at Rocanville. A part of a site is not a site in this registry. Rocanville's own record covers it.
- What a precise point marks. Several of the baseline's best positions are quoted from filings to a few metres and name the structure they mark. The registry keeps the point to about a kilometre and records only how it was established.
- The transport table. The baseline measures each site's distance to the nearest highway, railway and airport. That is not part of a site record, and the ways in to a site sit on the wrong side of this project's line. The loader now refuses fields named routes, approach or access, and a test checks it. Where potash leaves the country is already in the list as the export terminals.
- The contact sheets and the monitoring watchlist. The sheets carry labels; the watchlist belongs to the imagery pipeline.
Whether the transport table belongs in the game at all is Kevin's call. If it does, it should come in as a property of a district (how well connected it is), not of a site.
Positions
Grade A is a filed document or a government survey point. B is found and identified on satellite imagery. C is a published locus only.
| ID | Site | Location | Grade | Scene date | Frames on the page |
|---|---|---|---|---|---|
| T1-01 | Rocanville | 50.47° N, 101.55° W | A | 2026-10-22 | 5 km |
| T1-02 | Allan | 51.93° N, 106.07° W | A | 2026-09-28 | 5 km and 15 km |
| T1-03 | Lanigan | 51.86° N, 105.21° W | A | 2026-09-28 | 5 km and 15 km |
| T1-04 | Cory | 52.09° N, 106.85° W | A | 2026-07-28 | 5 km and 15 km |
| T1-05 | Vanscoy | 52.01° N, 107.09° W | A | 2026-07-28 | 5 km and 15 km |
| T1-06 | Patience Lake | 52.10° N, 106.37° W | B | 2026-07-30 | 5 km |
| T1-07 | Esterhazy | 50.65° N, 101.99° W | A | 2026-09-27 | 5 km and 15 km |
| T1-08 | Belle Plaine | 50.43° N, 105.20° W | A | 2026-11-06 | 5 km and 15 km |
| T1-09 | Colonsay | 51.94° N, 105.77° W | B | 2026-09-28 | 5 km and 15 km |
| T1-10 | Bethune | 50.65° N, 105.38° W | B | 2026-09-25 | 5 km and 15 km |
| T1-11 | Harrowby | 50.75° N, 101.45° W | B | 2026-10-04 | 5 km |
| T2-01 | Esterhazy K1 | 50.73° N, 101.93° W | A | 2026-09-27 | 5 km and 15 km |
| T2-02 | Esterhazy K2 | 50.66° N, 101.84° W | A | 2026-09-27 | 5 km and 15 km |
| T2-03 | Picadilly | 45.77° N, 65.37° W | B | 2026-08-05 | 5 km and 15 km |
| T2-04 | Penobsquis | 45.77° N, 65.37° W | B | 2026-08-05 | 5 km and 15 km |
| T3-01 | Jansen Stage 1 | 51.90° N, 104.71° W | A | 2026-09-28 | 5 km and 15 km |
| T3-02 | Jansen Stage 2 | 51.90° N, 104.71° W | A | 2026-09-28 | 5 km and 15 km |
| T3-03 | Bethune Ramp-Up | 50.65° N, 105.38° W | B | 2026-09-25 | 5 km and 15 km |
| T3-04 | Milestone Phase I | 50.19° N, 104.30° W | B | 2026-10-25 | 5 km and 15 km |
| T3-05 | Tugaske | 50.87° N, 106.29° W | C | none | none |
| T4-01 | Southey | 51.07° N, 104.52° W | A | 2026-07-17 | 5 km and 15 km |
| T4-02 | Milestone full scale | 50.19° N, 104.30° W | B | 2026-10-25 | 5 km and 15 km |
| T4-03 | Muskowekwan | 51.31° N, 104.10° W | C | 2026-07-17 | 5 km and 15 km |
| T4-04 | Wynyard | 51.70° N, 104.02° W | A | 2026-09-25 | 5 km and 15 km |
| T5-11 | Eyebrow | 50.80° N, 106.15° W | C | 2026-09-25 | 5 km and 15 km |
| T7-01 | Neptune Bulk Terminals | 49.31° N, 123.05° W | B | 2026-08-07 | 5 km and 15 km |
| T7-02 | Portland Bulk Terminals | 45.63° N, 122.78° W | B | 2026-07-13 | 5 km and 15 km |
| T7-03 | Saint John Terminal | 45.26° N, 66.06° W | B | 2026-09-19 | 5 km and 15 km |
| T7-04 | Thunder Bay Terminals | 48.38° N, 89.22° W | B | 2026-10-17 | 5 km and 15 km |
| T7-05 | Westshore Terminals | 49.02° N, 123.17° W | B | 2026-08-07 | 5 km and 15 km |
| T7-06 | Port of Churchill | 58.78° N, 94.19° W | B | 2026-09-04 | 5 km and 15 km |
| T7-07 | Prince Rupert potash terminal | 54.23° N, 130.33° W | B | 2026-08-21 | 5 km and 15 km |
| T7-08 | Longview export terminal | 46.10° N, 122.94° W | B | 2026-10-11 | 5 km |
Positions to treat as unsettled
- Picadilly and Penobsquis (T2-03, T2-04). Two works stand about 2 km apart near Sussex, New Brunswick. The baseline found both and could not establish which name belongs to which. Both records carry the same point, and both frames show both works.
- Harrowby (T1-11). Identified on imagery at the edge of what 10 m can show. Provisional.
- Saint John terminal (T7-03). A bulk-loading jetty with covered storage, identified on imagery. Not confirmed as the potash berth.
- Tugaske, Muskowekwan, Eyebrow (T3-05, T4-03, T5-11). Not built. The point is a village or reserve centroid. Eyebrow had no location in the registry before; it now has this one, at grade C.
- Southey and Wynyard (T4-01, T4-04). Not built. The point is the province's survey point for the permit area.
Imagery
- What it is. Copernicus Sentinel-2, true colour, 10 m to a pixel: the lowest-cloud pass over each site between 1 May and 17 November 2026. Contrast is stretched frame by frame, so brightness cannot be compared between sites.
- How it is shown. As it came. Nothing is marked, labelled or outlined on any frame.
- Credit. "Imagery: Roger Wilco Imagery. Contains modified Copernicus Sentinel data 2026, processed by Roger Wilco Imagery."
- Licence. The frames carry the Canada Potash Sites licence: free to use with credit for non-commercial purposes, and not for government use. Each page and the Sites index say so and link to the baseline.
Frames to re-pull
Six frames fall at the edge of a satellite tile and are partly empty. They were not used. Their sites show the frame that is whole; Tugaske has no whole frame and shows none.
| ID | Site | Frame | Empty |
|---|---|---|---|
| T1-01 | Rocanville | 15 km | 11% |
| T1-06 | Patience Lake | 15 km | 25% |
| T1-11 | Harrowby | 15 km | 8% |
| T3-05 | Tugaske | 5 km | 44% |
| T3-05 | Tugaske | 15 km | 48% |
| T7-08 | Longview | 15 km | 16% |
The fix is on the imagery side: build each frame from the two neighbouring tiles.
Two points from the baseline's own notes, for Kevin
- The licence is not a Creative Commons licence. Adding "no government use" to CC BY-NC makes it a licence of its own. The baseline says so, and this site names it "Canada Potash Sites licence" for that reason.
- The transport figures are built on OpenStreetMap, whose licence may require share-alike for a derived database. The baseline flags that as a question for counsel. It does not arise here, because the transport table was not imported.
What changed in the code
data/sites/potash.yaml: 22 new locations; aloc_gradeon all 33; notes on the unsettled ones; a new source key,rwi.forceonforce/sites.py:LOC_GRADES; the loader checks grades and refusesroutes,approachandaccess.tools/import_rwi_potash.py: the import.tools/site/sites/: 60 frames andimagery.yaml.tools/build_site.py: two frames per site page with date, credit and licence; how each point was placed; an imagery line on the Sites index.- Tests: 36 (was 35).
Ahead
Unchanged from v0.1.3.9.1: districts in the simulation, then output lost by district on a schedule, then US food supply and agriculture. The positions in this version are what the first of those will be drawn from.