Sites
44 named places, each with a page: what it is, who holds it and how much it produces. Sites say where a resource sits. They add up to district totals, and the game works on the totals.
[1.0]What a site record is, and is not
- It is a description of a place. Name, holder, province and district, what kind of operation it is, its capacity and production, and its status. Every line has a source.
- It is for dividing the map. A province is too coarse a unit: its mines, bases and people sit in particular parts of it. Sites are how the game will learn which parts.
- It is not a target list. A record holds nothing about the inside of a site, no assessment of how it could be damaged and no ranking of sites by the harm their loss would do. Locations are kept to about a kilometre, enough to place a site in a district. The data files refuse those fields, and a test checks it.
- Lists arrive in stages. Potash is the first. The roadmap has what follows.
List 1Potash: 44 sites
Added in
0.1.3.9. File
data/sites/potash.yaml. Source:
Prime Rogue Inc., Canadian Potash Sites Inventory, November 2026 (
Kevin Duska), as of 2026-11.
Figures are transcribed from that inventory and have not been re-checked against the filings. Where it flags a conflict or a gap, the site's page says so.
Where the producing capacity sits
Operating capability of the 11 producing mines, in million tonnes of KCl a year, and their latest reported year of production. Districts are the modeller's grouping by nearest large centre.
The game's resources module puts all Canadian potash in Saskatchewan. The site list agrees: Saskatchewan holds 99.6% of operating capability.
So adding these sites changes no result yet. What it adds is the split inside Saskatchewan, which matters once the game tracks control below the level of a province.
Producing (11)
| ID | Site | Holder | Where | Capacity | Status |
|---|
| T1-01 | Rocanville | Nutrien | about 15 km north-east of the town of Rocanville | 4.5 Mt | Producing |
| T1-02 | Allan | Nutrien | Allan | 3.1 Mt | Producing |
| T1-03 | Lanigan | Nutrien | Lanigan | 3.5 Mt | Producing |
| T1-04 | Cory | Nutrien | west of Saskatoon | 2.2 Mt | Producing |
| T1-05 | Vanscoy | Nutrien | Vanscoy | 1.1 Mt | Producing |
| T1-06 | Patience Lake | Nutrien | near Saskatoon | 0.3 Mt | Producing |
| T1-07 | Esterhazy | Mosaic | Esterhazy | 6.3 Mt | Producing from K3. The K1 and K2 shafts were closed in 2021 and 2022. |
| T1-08 | Belle Plaine | Mosaic | Belle Plaine, west of Regina | 3 Mt | Producing |
| T1-09 | Colonsay | Mosaic | Colonsay | 1.5 Mt | Producing. Mosaic's swing mine: idled in the first half of 2023 and restarted in July 2023. |
| T1-10 | Bethune | K+S Potash Canada | about 50 km north of Moose Jaw | 2 Mt | Producing |
| T1-11 | Harrowby | Potash and Agri Development Corporation of Manitoba (PADCOM) | Municipality of Russell-Binscarth, 16 km west of Russell | 0.1 Mt | Producing at small scale |
Closed (4)
| ID | Site | Holder | Where | Capacity | Status |
|---|
| T2-01 | Esterhazy K1 | Mosaic | Esterhazy | | Mining ended in the second quarter of 2021. Shaft closure was completed in 2022. |
| T2-02 | Esterhazy K2 | Mosaic | Esterhazy | | Mining ended in the second quarter of 2021. Shaft closure was completed in 2022. |
| T2-03 | Picadilly | Nutrien | near Sussex and Penobsquis | | Care and maintenance from early 2016. Permanently closed as a potash mine in November 2018. |
| T2-04 | Penobsquis | Nutrien | Penobsquis | | Closed. CBC's reporting is consistent with late 2015; another source says 2018. |
Under construction or advanced (5)
| ID | Site | Holder | Where | Capacity | Status |
|---|
| T3-01 | Jansen Stage 1 | BHP | about 140 km east of Saskatoon | 4.15 Mt (design) | Under construction: 84% complete in BHP's FY26 annual report |
| T3-02 | Jansen Stage 2 | BHP | about 140 km east of Saskatoon | 4.36 Mt (design) | Approved in October 2023; 16% complete |
| T3-03 | Bethune Ramp-Up | K+S Potash Canada | about 50 km north of Moose Jaw | 4 Mt (target) | Construction began in September 2025 |
| T3-04 | Milestone Phase I | Western Potash Corp. | 35 km south-east of Regina | 0.146 Mt (design) | About 85% complete and on hold for financing. Dry-commissioned in November 2023. |
| T3-05 | Tugaske | Gensource Potash Corp. | south-central Saskatchewan, on the Vanguard lease | 0.25 Mt (original design) | Before a final investment decision. On 16 November 2026 Saskatchewan confirmed and extended its environmental decision for the original design. |
Approved, not built (4)
| ID | Site | Holder | Where | Capacity | Status |
|---|
| T4-01 | Southey | Yancoal Canada Resources | about 60 km north of Regina, near Southey and Earl Grey | 2.8 Mt (design) | Approved, not built. Whether the Highfield sale has closed is not confirmed as of November 2026. |
| T4-02 | Milestone full scale | Western Potash Corp. | south-east of Regina | 2.8 Mt (design) | Unfunded |
| T4-03 | Muskowekwan | First Potash Ventures | about 100 km north-north-east of Regina, on the Muskowekwan reserve near Lestock, Treaty 4 territory | 2.8 Mt (design) | Dormant. Current status not found. |
| T4-04 | Wynyard | Karnalyte Resources | Wynyard, about 175 km east of Saskatoon | 0.675 Mt (phase 1) | Unfinanced. The company calls it construction ready. |
Tenure and undeveloped deposits (12)
| ID | Site | Holder | Where | Capacity | Status |
|---|
| T5-01 | Jansen expansion lands | BHP | around Jansen | | Mostly inferred resource. The basis of possible Stages 3 and 4. |
| T5-02 | KL 279, the Stockholm project | Nutrien, bought from an Acron subsidiary in May 2020 | south-east Saskatchewan, next to Rocanville | | Undeveloped. Folded into planning for Rocanville. |
| T5-03 | Esterhazy K4 resource area | Mosaic | Esterhazy | | A future extension, scheduled for 2045 to 2078. |
| T5-04 | Kronau and Regina freehold block | Mosaic | between Kronau and Regina | | Not developed |
| T5-05 | Albany project | North Atlantic Potash Inc., owned by Acron (Russia) | southern Saskatchewan | | Held, undeveloped |
| T5-06 | Foam Lake project | North Atlantic Potash Inc., owned by Acron (Russia) | the northern part of Saskatchewan's potash belt | | Held, undeveloped |
| T5-07 | Former North Atlantic Potash permits | Yancoal Canada, bought from North Atlantic Potash for $110 million | north of Regina | | Eight permits. The basis of Southey and of four other potash rights held by Yancoal. |
| T5-08 | Sedley deposit | Historically a joint venture of North Atlantic Potash and Rio Tinto. Current holder not found. | south-east of Regina, near Sedley | | Historic joint venture |
| T5-09 | Former Acron permit sold to BHP | BHP | central Saskatchewan | | Sold around 2010. Probably inside BHP's tenure now. |
| T5-10 | Former Acron permit sold to Sanya Resource Corp | Sanya Resource Corp | Saskatchewan | | Current status not found |
| T5-11 | Eyebrow | Gensource Potash Corp. | Saskatchewan | | Early stage. A small solution mine of the same kind as Tugaske. |
| T5-12 | Vanguard lease, the remainder | Gensource Potash Corp. | south-central Saskatchewan | | Unexplored ground |
Export and logistics (8)
| ID | Site | Holder | Where | Capacity | Status |
|---|
| T7-01 | Neptune Bulk Terminals | Neptune Bulk Terminals | North Vancouver, British Columbia | 11.5 Mt (rated) | Operating |
| T7-02 | Portland Bulk Terminals | Metro Ports | Portland, Oregon, United States | 7.5 Mt (rated) | Operating |
| T7-03 | Saint John Terminal | Canpotex Terminals Ltd. | Saint John, New Brunswick | 2 Mt (rated) | Operating |
| T7-04 | Thunder Bay Terminals | A Canpotex route | Thunder Bay, Ontario | | Operating |
| T7-05 | Westshore Terminals | Westshore Terminals | Delta, British Columbia | | Being readied for Jansen |
| T7-06 | Port of Churchill | Arctic Gateway Group | Churchill, Manitoba | | Operating; test volumes of potash only |
| T7-07 | Prince Rupert potash terminal | Canpotex | Prince Rupert, British Columbia | 13 Mt (planned) | Never built. Permitted in 2015 and abandoned in 2016. |
| T7-08 | Longview export terminal | Nutrien | Longview, Washington, United States | 5.5 Mt (planned) | Proposed. Site selected in 2026. |