A grognard exercise, not a scientific model. What that means

Sites / Potash / T1-01

Rocanville

ProducingSaskatchewanPotash list, T1-01
Rocanville from above, 5 km across
5 km across
Scissors Creek shaft, about 16 km west of the main site, 5 km across
Scissors Creek shaft, about 16 km west of the main site, 5 km across

Sentinel-2, 22 October 2026. Imagery: Roger Wilco Imagery. Contains modified Copernicus Sentinel data 2026, processed by Roger Wilco Imagery. From the Canada Potash Sites baseline, under the Canada Potash Sites licence: free to use with credit for non-commercial purposes, and not for government use. The wider frame is to come: this pass fell at the edge of a satellite tile.

What it is

OperatorNutrien
OwnerNutrien Ltd., 100%, through Potash Corporation of Saskatchewan Inc.
Province or stateSaskatchewan
DistrictSouth-east Saskatchewan
Whereabout 15 km north-east of the town of Rocanville
Location50.47° N, 101.55° W, to about a kilometre. How it was placed: from a filed document or a government survey point (grade A)
How it is minedconventional underground
First production1970
StatusProducing
TenureCrown lease KL 305; KL 279 added in May 2020
See alsoKL 279, the Stockholm project

Numbers

Capacity

MeasureMt a year
Nameplate or proven peaking6.5
Operational, 20245.1
Operational, 20255
Operational, 20264.5

Production

YearMt
20234.97
20245.02
20254.64

Reserves

Reserves343 Mt of ore
Grade22.7% K2O
Remaining life21 years

What is where

WhatPositionSource
No. 2 shaft collar50.4721° N, 101.545° WNutrien NI 43-101 technical reports, effective 31 December 2024 (SEC EDGAR)
Scissors Creek shaft collar50.452° N, 101.77° WNutrien NI 43-101 technical reports, effective 31 December 2024 (SEC EDGAR)

Published positions, given as their source gives them. The game does not use them: it works on district totals.

Notes

  • Canada's largest potash mine by nameplate capacity. It includes the Scissors Creek shaft.
  • Nutrien's technical report gives it 21 years of reserve life at the current hoisting rate, the shortest of the Nutrien mines reviewed.
  • Nutrien cut its 2026 operational capability to 4.5 Mt from 5.0 Mt in 2025.
  • Built by Sylvite of Canada, a division of Hudson's Bay Mining and Smelting. PotashCorp acquired it in 1977.
  • Since 1970 it has hoisted 347 Mt of ore for 111 Mt of product.

In the game

It counts toward the potash total of South-east Saskatchewan: 4.5 of 10.8 Mt of operating capability there, and 16.3% of Canada's. The game does not yet treat districts separately: all Canadian potash is still one flow out of Saskatchewan.

This page describes the place. It holds nothing about the inside of the site and no assessment of how it could be damaged. Why.

Sources

  • Nutrien NI 43-101 technical reports, effective 31 December 2024 (SEC EDGAR), as cited in the inventory
  • Nutrien annual reports for FY2024 and FY2025 (40-F and 6-K exhibits, SEC EDGAR), as cited in the inventory
  • Roger Wilco Imagery, Canada potash baseline, 19 November 2026 (https://github.com/Prime-Rogue-Inc-Corporate/Canada-Potash-Sites): site positions with a confidence grade, and Sentinel-2 imagery

Transcribed from Prime Rogue Inc., Canadian Potash Sites Inventory, November 2026 (Kevin Duska), and not re-checked against the filings for this page. Units: million tonnes of finished KCl product a year, unless a line says otherwise. Record in data/sites/potash.yaml, added in 0.1.3.9.