Lanigan


Sentinel-2, 28 September 2026. Imagery: Roger Wilco Imagery. Contains modified Copernicus Sentinel data 2026, processed by Roger Wilco Imagery. From the Canada Potash Sites baseline, under the Canada Potash Sites licence: free to use with credit for non-commercial purposes, and not for government use.
What it is
| Operator | Nutrien |
| Owner | Nutrien Ltd., 100% |
| Province or state | Saskatchewan |
| District | East-central Saskatchewan |
| Where | Lanigan |
| Location | 51.86° N, 105.21° W, to about a kilometre. How it was placed: from a filed document or a government survey point (grade A) |
| How it is mined | conventional underground |
| First production | 1968 |
| Status | Producing |
| Tenure | Potash lease special agreement KLSA 001 D |
Numbers
Capacity
| Measure | Mt a year |
|---|---|
| Nameplate or proven peaking | 3.8 |
| Operational, 2024 | 3 |
| Operational, 2025 | 3.2 |
| Operational, 2026 | 3.5 |
Production
| Year | Mt |
|---|---|
| 2023 | 2.89 |
| 2024 | 3.4 |
| 2025 | 3.43 |
Reserves
| Reserves | 460 Mt of ore |
| Grade | 24.7 (A zone), 20.2 (B zone)% K2O |
| Remaining life | 30 (A zone), 23 (B zone) |
What is where
| What | Position | Source |
|---|---|---|
| No. 2 shaft collar | 51.8557° N, 105.21° W | Nutrien NI 43-101 technical reports, effective 31 December 2024 (SEC EDGAR) |
Published positions, given as their source gives them. The game does not use them: it works on district totals.
Notes
- Operational capability was 2.0 Mt at the end of 2018 and is 3.5 Mt for 2026.
In the game
It counts toward the potash total of East-central Saskatchewan: 3.5 of 3.5 Mt of operating capability there, and 12.7% of Canada's. The game does not yet treat districts separately: all Canadian potash is still one flow out of Saskatchewan.
This page describes the place. It holds nothing about the inside of the site and no assessment of how it could be damaged. Why.
Sources
- Nutrien NI 43-101 technical reports, effective 31 December 2024 (SEC EDGAR), as cited in the inventory
- Nutrien annual reports for FY2024 and FY2025 (40-F and 6-K exhibits, SEC EDGAR), as cited in the inventory
- Roger Wilco Imagery, Canada potash baseline, 19 November 2026 (https://github.com/Prime-Rogue-Inc-Corporate/Canada-Potash-Sites): site positions with a confidence grade, and Sentinel-2 imagery
Transcribed from Prime Rogue Inc., Canadian Potash Sites Inventory, November 2026 (Kevin Duska), and not re-checked against the filings for this page. Units: million tonnes of finished KCl product a year, unless a line says otherwise.
Record in data/sites/potash.yaml, added in 0.1.3.9.