Colonsay


Sentinel-2, 28 September 2026. Imagery: Roger Wilco Imagery. Contains modified Copernicus Sentinel data 2026, processed by Roger Wilco Imagery. From the Canada Potash Sites baseline, under the Canada Potash Sites licence: free to use with credit for non-commercial purposes, and not for government use.
What it is
| Operator | Mosaic |
| Owner | Mosaic Potash Colonsay ULC, a wholly owned indirect subsidiary of Mosaic |
| Province or state | Saskatchewan |
| District | Saskatoon district |
| Where | Colonsay |
| Location | 51.94° N, 105.77° W, to about a kilometre. How it was placed: found and identified on satellite imagery (grade B) |
| How it is mined | conventional underground |
| Status | Producing. Mosaic's swing mine: idled in the first half of 2023 and restarted in July 2023. |
| Tenure | KL 108 |
Numbers
Capacity
| Measure | Mt a year |
|---|---|
| Nameplate or proven peaking | 2.6 |
| Operational, 2024 | 1.5 |
| Operational, 2025 | 1.5 |
Production
| Year | Mt |
|---|---|
| 2024 | 0.6 |
| 2025 | 0.8 |
Reserves
| Reserves | 267 Mt of ore |
| Grade | 26.5% K2O |
What is where
| What | Position | Source |
|---|---|---|
| Mill and headframe, north of the tailings | 51.9369° N, 105.766° W | Roger Wilco Imagery, Canada potash baseline, 19 November 2026 |
Published positions, given as their source gives them. The game does not use them: it works on district totals.
Notes
- Operational capacity can reach 2.1 Mt with more staff.
- The highest-grade ore in Mosaic's Canadian mines.
In the game
It counts toward the potash total of Saskatoon district: 1.5 of 8.2 Mt of operating capability there, and 5.4% of Canada's. The game does not yet treat districts separately: all Canadian potash is still one flow out of Saskatchewan.
This page describes the place. It holds nothing about the inside of the site and no assessment of how it could be damaged. Why.
Sources
- Mosaic Form 10-K for FY2024 and FY2025, with the S-K 1300 technical report summaries (SEC EDGAR), as cited in the inventory
- Roger Wilco Imagery, Canada potash baseline, 19 November 2026 (https://github.com/Prime-Rogue-Inc-Corporate/Canada-Potash-Sites): site positions with a confidence grade, and Sentinel-2 imagery
Transcribed from Prime Rogue Inc., Canadian Potash Sites Inventory, November 2026 (Kevin Duska), and not re-checked against the filings for this page. Units: million tonnes of finished KCl product a year, unless a line says otherwise.
Record in data/sites/potash.yaml, added in 0.1.3.9.