A grognard exercise, not a scientific model. What that means

Sites / Potash / T1-11

Harrowby

ProducingManitobaPotash list, T1-11
Harrowby from above, 5 km across
5 km across

Sentinel-2, 4 October 2026. Imagery: Roger Wilco Imagery. Contains modified Copernicus Sentinel data 2026, processed by Roger Wilco Imagery. From the Canada Potash Sites baseline, under the Canada Potash Sites licence: free to use with credit for non-commercial purposes, and not for government use. The wider frame is to come: this pass fell at the edge of a satellite tile.

What it is

OperatorPotash and Agri Development Corporation of Manitoba (PADCOM)
OwnerPADCOM; Gambler First Nation holds 20% of the equity
Province or stateManitoba
DistrictWestern Manitoba
WhereMunicipality of Russell-Binscarth, 16 km west of Russell
Location50.75° N, 101.45° W, to about a kilometre. How it was placed: found and identified on satellite imagery (grade B). Provisional. Identified on satellite imagery, at the edge of what 10 m imagery can show.
How it is minedselective solution mining
First productionPilot production in 2023; commercial production targeted for June 2026
StatusProducing at small scale
Also known asPADCOM

Numbers

Capacity

MeasureMt a year
Permitted0.25
Phase 10.1

What is where

WhatPositionSource
Small pad and cooling pond beside the CN line, 12 km west of Russell (provisional)50.7541° N, 101.455° WRoger Wilco Imagery, Canada potash baseline, 19 November 2026

Published positions, given as their source gives them. The game does not use them: it works on district totals.

Notes

  • Guidance for its first full year is 30,000 to 35,000 tonnes.
  • Manitoba expects about $8 million a year in royalties at 250,000 tonnes.
  • It has shipped a cargo to Belgium through the Port of Churchill.

In the game

It counts toward the potash total of Western Manitoba: 0.1 of 0.1 Mt of operating capability there, and 0.4% of Canada's. The game does not yet treat districts separately: all Canadian potash is still one flow out of Saskatchewan.

This page describes the place. It holds nothing about the inside of the site and no assessment of how it could be damaged. Why.

Sources

  • PADCOM statements, CBC (May 2026), Global News and the Impact Assessment Agency of Canada registry, as cited in the inventory
  • Roger Wilco Imagery, Canada potash baseline, 19 November 2026 (https://github.com/Prime-Rogue-Inc-Corporate/Canada-Potash-Sites): site positions with a confidence grade, and Sentinel-2 imagery

Transcribed from Prime Rogue Inc., Canadian Potash Sites Inventory, November 2026 (Kevin Duska), and not re-checked against the filings for this page. Units: million tonnes of finished KCl product a year, unless a line says otherwise. Record in data/sites/potash.yaml, added in 0.1.3.9.